Absolutely, although as I work offshore for 6 weeks at a time it will be a month and a half of nothing followed by hopefully a lot of progress every day.
The Durastud floor gets my strong recommendation. For me it was really easy to fit, provides a nice layer of insulation on the concrete floor and so far has been very hard wearing. Also really helped with moving wheeled axle stands and the engine hoist around.
Absolutely, although as I work offshore for 6 weeks at a time it will be a month and a half of nothing followed by hopefully a lot of progress every day.
Sounds good, looking forward to seeing your progress!
Pete
Fancy a club Nürburgring trip in 2023?
#10 - thanks Steve.
The Durastud floor gets my strong recommendation. For me it was really easy to fit, provides a nice layer of insulation on the concrete floor and so far has been very hard wearing. Also really helped with moving wheeled axle stands and the engine hoist around.
Blogging my progress at : https://www.tiggercaterham.co.uk